Tuesday 12 June 2012

Monday 11 June 2012

Project 3: Week 11 - Plans, Sections,Tectonics








Site, Plans, Sections, Details
Source: H. Thach, 2012


Section A-A
Source: H. Thach, 2012


Closed Position
Source: H. Thach, 2012
Operational Diagram : Funtionality of Open and Close

Operational Diagram : Flood Prevention Function

The building can elevate above flood level in the prevention of a flood and server damage.


Operational Diagram : Sun Direction Function

The building is orientated in the current position so that it can obtain the maximum sunlight through the building as the sun path moves from east to west of the northern pathway.

Project 3: Space Planning












- non-programmed public space [internal and/or external] 80sqm
- general performance/class space [with stage + small backstage area] 100sqm
- space for performance/classes of ‘aerial silks’ [6-9m high] 50sqm
- room for life drawing [needs to be divisible into 2 spaces] 20sqm
- a small cafe [restricted to 3.5m width] 35sqm
- administration/offices 40sqm + services
- entry foyer variable
+ services [wc, store, kitchenett for staff, circulation, etc] approx. 30%




total approx. 500sqm















Source: C. Trinh, 2012